home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / DAILY_1 / 921210.DFC < prev    next >
Text File  |  1992-12-13  |  32KB  |  760 lines

  1.  
  2.  
  3. 11-Dec-92 Daily File Collection
  4.    These files were added or updated between 10-Dec-92 at 21:00:00 {Central}
  5.                                          and 11-Dec-92 at 21:00:11.
  6.  
  7. =--=--=START=--=--= NASA Spacelink File Name:921211.REL
  8.  
  9. 12/11/92:  CASSINI SATURN MISSION, SPACECRAFT FINALIZED
  10.  
  11. Donald L. Savage
  12. Headquarters, Washington, D.C.             December 11, 1992
  13.  
  14.  
  15. Franklin O'Donnell
  16. Jet Propulsion Laboratory, Pasadena, Calif.
  17.  
  18.  
  19.  
  20. RELEASE:  92-222
  21.  
  22.      NASA's Cassini mission to Saturn has passed a major milestone with the
  23. completion this week of a project-wide critical design review.
  24.  
  25.      The review, which included a comprehensive examination of the mission and
  26. spacecraft, closed today at NASA's Jet Propulsion Laboratory, Pasadena, Calif.
  27.  
  28.      "We are very pleased with the outcome of the review and the status of all
  29. elements of the project," said Richard J. Spehalski, Cassini Project Manager at
  30. JPL. "The design process is moving forward very briskly."
  31.  
  32.      In addition to JPL Cassini team members, the review included presentations
  33. by Dr. Hamid Hassan, European Space Agency Project Manager for Cassini's
  34. Huygens Titan probe and Dr. Romeo Pernice of the Italian Space Agency which is
  35. contributing Cassini's high-gain antenna and science instrumentation.
  36.  
  37.      In other recent activities related to Cassini, NASA issued letters to
  38. scientific investigators formally confirming the mission's experiment payload.
  39.  
  40.      The 12 experiments onboard the Cassini orbiter were tentatively selected
  41. in 1990, subject to evaluation during an "accommodation period" until the
  42. confirmation was issued.  Another six experiments are on ESA's Huygens probe.
  43.  
  44.      Planned for launch on a Titan IV-Centaur in October 1997, Cassini will fly
  45. by Venus twice as well as by Earth and Jupiter before arriving at Saturn in
  46. November 2004 to begin a 4-year orbital tour of the ringed planet and its 18
  47. moons.  The Huygens probe will descend to the surface of one of the moons,
  48. Titan, in June 2005.
  49.  
  50.      JPL manages the Cassini mission for NASA's Office of Space Science and
  51. Applications, Washington, D.C.
  52.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  53. =--=--=-END-=--=--=
  54.  
  55. =--=--=START=--=--= NASA Spacelink File Name:921211.SHU
  56.  
  57. KSC SHUTTLE STATUS 12-11/92 
  58.  
  59.  
  60.                 KSC SPACE SHUTTLE STATUS REPORT
  61.                     Friday, December 11, 1992
  62.  
  63. Bruce Buckingham
  64. Kennedy Space Center
  65.  
  66.  
  67.  
  68.  
  69. Vehicle: Endeavour/OV-105
  70. Location: Launch Pad 39-B
  71. Mission: STS-54/TDRS-F
  72. Mission Duration: 6 days     Crew Size: 5
  73. Target Launch Date: Second Week in January, 1993
  74. Estimated Launch Time: 8:52 am EST
  75.  
  76.  
  77. IN WORK TODAY:
  78.  
  79. *  Work to secure heaters for Orbital Maneuvering System and
  80.    Reaction Control System for weekend powerdown.
  81. *  Preparations for Terminal Countdown Demonstration Test
  82. *  Auxiliary Power Unit leak checks
  83.  
  84. WORK SCHEDULED:
  85.  
  86. *  Terminal Countdown Demonstration Test next week
  87.     - Crew arrival 11:30 am Monday;
  88.     - PAO session with crew at pad 3:30 pm Tuesday;
  89.     - T-0 11:00 am Wednesday.
  90. *  Open payload bay doors
  91. *  Launch Readiness Review (Thursday, Dec. 17)
  92. *  Flight Readiness Review (Dec. 22)
  93. *  TDRS/IUS end-to-end test (Monday, Dec. 14)
  94. *  IUS flight readiness checks (Wednesday, Dec. 16)
  95.  
  96. WORK COMPLETED:
  97.  
  98. *  Pre-launch hypergolic propellant loads
  99. *  Pad open for normal work 10:00 p.m. Thursday
  100. *  TDRS/Orbiter integration verification test
  101.  
  102.  
  103.  NOTE ON DISCOVERY: MISSION STS-53/DOD -- DRYDEN FLIGHT RESEARCH
  104.                        CENTER, CALIFORNIA 
  105.  
  106.      Discovery remains in the Mate-Demate Device at the Dryden Flight Research
  107. Center following its landing at 3:43 pm EST Wednesday, Dec. 9.  The vehicle has
  108. been jacked and leveled and operations are continuing to prepare it for ferry
  109. flight beginning Dec. 15.  Discovery is slated for a two-day cross-country
  110. flight atop the modified 747 Shuttle Carrier Aircraft. If weather allows,
  111. arrival at KSC is targeted for mid-afternoon Dec. 16.
  112.  
  113.  
  114.  
  115.  
  116. Vehicle: Columbia/OV-102
  117. Location: Orbiter Processing Facility bay 2
  118. Mission: STS-55/SL-D2
  119. Mission Duration: 8 days/22 hours     Crew Size: 7
  120. Target Launch Date: Last Week in February, 1993
  121. Estimated Launch Time: 10:30 am EST
  122.  
  123.  
  124.      Work continues to go well with the Shuttle Columbia in OPF bay 2.
  125. Upcoming operations include: Orbital Maneuvering System functional tests; freon
  126. coolant loop servicing and tests; hydraulic system operations; landing gear
  127. functional tests; and aerosurface functional checks.  Columbia is targeted for
  128. roll to the Vehicle Assembly Building in early February.
  129.  
  130.      Work on the Solid Rocket Boosters continues in Vehicle Assembly Building
  131. with the right forward segment being mated today.  Next week work will commence
  132. to demate the left forward center segment.  The segment failed two low-pressure
  133. leak checks last week.  The leaks are believed to be due to faulty ground
  134. support equipment.  However, managers have decided to destack the left forward
  135. center segment to confirm this theory.  This unplanned operation is expected to
  136. have no impact on the launch of STS-55, however, it will slip the external tank
  137. mate into early next year.
  138.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  139. =--=--=-END-=--=--=
  140.  
  141. =--=--=START=--=--= NASA Spacelink File Name:921211.SKD
  142.  
  143. DAILY NEWS/TV SKED 12/11/92 
  144.  
  145. Daily  News
  146. Friday, December 11, 1992
  147. Headquarters, Washington, D.C. 20546
  148. Audio service: 202/358-3014
  149.  
  150.  % KSC ground team finds few tile dings on Discovery;
  151.  % Endeavour preparations coming to a close, TCDT set for next week;
  152.  % 5th Town Meeting gets underway at 1:00 pm today in Tampa;
  153.  % Upper Atmosphere Research Satellite continues doing fine-save one device;
  154.  % Russian and U.S. satellite-mounted Ozone Mappers also performing solidly.
  155.  
  156. * * * * * * * * * * * * * * * *
  157.  
  158. The Kennedy Space Center ground processing team has examined Discovery,
  159. following Wednesday's landing, and found 126 dings to tiles with only 9 being
  160. larger than a couple of centimeters (one inch or less).  Present plans call for
  161. Discovery to make the 747-ferry flight back to Florida starting next Tuesday,
  162. Dec. 15.
  163.  
  164. Meanwhile, back on Florida's Spacecoast, KSC technicians working to prepare
  165. Endeavour for its January 1993, STS-54 mission to deploy the Tracking and Data
  166. Relay Satellite, are in the process of closing out various vehicle systems or
  167. loading various propellants and reactants.  The launch dress-rehearsal-Terminal
  168. Countdown Demonstration Test- will be conducted next Tuesday and Wednesday,
  169. Dec. 15 and 16.  Endeavour's STS-54 TDRS-deploy mission is set for launch in
  170. mid-January.
  171.  
  172. * * * * * * * * * * * * * * * *
  173.  
  174. NASA Administrator Daniel Goldin will begin today the fifth in NASA's series of
  175. Town Meetings, this one in the Theater of the University of South Florida at
  176. Tampa. Accompanying the Administrator will be other high-ranking NASA officials
  177. who will also participate in the colloquium.  NASA Select television coverage
  178. of this event will begin at 1:00 pm EST. The Town Meetings include
  179. presentations by these top NASA officials and invited individuals from
  180. universities and industry, in this case from Florida. Members of the audience
  181. have several opportunities during the 4-hour long meeting to raise questions or
  182. comment on the presentations.  The next Town Meeting will be held in Seattle on
  183. Dec. 16.
  184.  
  185. * * * * * * * * * * * * * * * *
  186.  
  187. Satellite controllers at the Goddard Space Flight Center report the Upper
  188. Atmosphere Research Satellite is performing nominally and all instruments
  189. except one are performing their scheduled scientific investigations.  The
  190. chopper motor on the Improved Stratospheric and Mesopheric Sounder previously
  191. had failed, preventing that instrument from functioning.  Goddard and UARS
  192. technicians continue troubleshooting on the instrument and were encouraged
  193. recently by changes in the thermal behavior of the system.
  194.  
  195. Goddard staff working with the Meteor-3/Total Ozone Mapping Spectrometer
  196. project report their instrument aboard the Russian weather satellite continues
  197. to function perfectly.  Atmospheric scientists at Goddard are presently
  198. studying the effect of the Russian satellite's different orbit on their ability
  199. to predict ozone trends.  The Russian satellite's orbit also allows for
  200. observations of aerosols, such as those erupted by the Mt. Pinatubo volcano, on
  201. near-twilight ozone observations.  The scientists report that data quality from
  202. their TOMS instruments-on the Russian Meteor spacecraft and the U.S. Nimbus-7
  203. spacecraft-has continued to be excellent.
  204.  
  205. * * * * * * * * * * * * * * * *
  206.  
  207. Hubble Space Telescope astronomers will present more new findings, this time
  208. concerning protoplanets, at a Space Astronomy Update program next Wednesday,
  209. Dec. 16, at 1:00 pm.  The program will be shown live on NASA Select television.
  210.  
  211.   
  212. Here's the broadcast schedule for Public Affairs events 
  213. on NASA Select TV.  Note that all events and times may 
  214. change without notice, and that all times listed are 
  215. Eastern.  Live indicates a program is transmitted live.
  216.  
  217. Friday, December 11, 1992
  218. Live   12:00 pm  NASA Today news program.
  219.        12:15 pm  Aeronautics & Space Report.
  220.        12:30 pm  Shaping Tomorrow.
  221.         1:00 pm  NASA Town Meeting #5 from the Theater on 
  222.                    the campus of the University of South Florida at Tampa.
  223.      at 4:00 and 8:00 pm and 12:00 midnight the broadcast 
  224.                    schedule of the day repeats.
  225.  
  226. Wednesday, December 16, 1992
  227.    Live  1:00 pm  Astronomy Update series on Hubble Space 
  228.                    Telescope images of protoplanets.
  229.       at 4:00 and 8:00 pm and 12:00 midnight the broadcast 
  230.                     schedule of the day repeats.
  231.   
  232. NASA Select TV is carried on GE Satcom F2R, transponder 13, C-Band, 72 degrees
  233. West Longitude, transponder frequency is 3960 MegaHertz, audio subcarrier is
  234. 6.8 MHz, polarization is vertical.
  235.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  236. =--=--=-END-=--=--=
  237.  
  238. =--=--=START=--=--= NASA Spacelink File Name:921211A.REL
  239.  
  240. 12/11/92:  EDUCATIONAL BROADCASTS FEATURE ROLE MODELS
  241.  
  242. Terri Sindelar                                 December 11, 1992
  243. NASA Headquarters, Washington, D.C.
  244.  
  245. Patrick Golden
  246. Virginia Space Grant Consortium, Hampton, Va.
  247.  
  248.  
  249. RELEASE:  92-221
  250.  
  251.         To encourage students to study math and science, a 5-part series of
  252. teleconferences will be broadcast nationwide highlighting young minority and
  253. female student aerospace researchers as role models for middle and high school
  254. students.
  255.  
  256.         The series, called "Reaching for the Stars", premiers Dec. 16.
  257. Subsequent programs will be broadcast on Feb. 10, March 17, April 7 and May 12.
  258. Each half-hour telecast begins at 2 p.m.  Eastern time.
  259.  
  260.         "Reaching for the Stars" presents viewers with a realistic picture of
  261. the personal and academic paths five college students, from Virginia Space
  262. Grant Colleges, took to reach their present courses of study in math, science
  263. and engineering.  Students will discuss their research and teach a lesson on a
  264. basic math or science concept pertinent to their research.
  265.  
  266.          The experiences of the student researchers featured in this series
  267. will help student viewers understand the need for strong academic preparation
  268. in math and science to take advantage of future high-tech work opportunities.
  269. The students will discuss factors that influenced their career choices and
  270. suggest ways the student viewers can follow similar paths.  The television
  271. audience can call in questions to the student researcher during each broadcast.
  272.  
  273.         To register for the free "Reaching for the Stars" series, contact Old
  274. Dominion University's Academic Television Services at 800/548-4807.  Sites
  275. registering will receive satellite coordinates and resource packets with
  276. additional classroom activities and suggestions for further readings.
  277.  
  278.  
  279.         The series also will be broadcast on NASA Select TV, via Satcom F2R,
  280. Transponder 13.
  281.  
  282.         "Reaching for the Stars" program highlights include:
  283.  
  284.                 % Dec. 16, 1992 - Apriel Hodari, pursuing a master's degree in
  285. physics at Hampton University, is researching the ways in which a laser can be
  286. used to detect windshear Q the sudden change of wind direction and intensity
  287. that can lead to airplane crashes.
  288.  
  289.                 % Feb. 10, 1993 - Rebecca Bourn is in the second year of her
  290. master's program in applied math at the University of Virginia,
  291. Charlottesville. Bourn has been studying the phenomenon of turbulence in fluid
  292. flow.  Rebecca is using mathematical models to study the conditions under which
  293. turbulence occurs.
  294.  
  295.                 % March 17, 1993 - Wendy Kraus, a senior majoring in chemistry
  296. at the College of William and Mary, Williamsburg, is studying the properties of
  297. the element boron that may make it an effective protective coating for a space
  298. station or during travel to Mars and beyond.
  299.  
  300.                 % April 7, 1993 - Derrek Dunn is working toward his doctorate
  301. in Electrical Engineering at Virginia Tech, Blacksburg. Dunn is researching the
  302. effects of different Earth orbits on antenna beam efficiency.
  303.  
  304.                 % May 12, 1993 - Lillianne Troeger, a mechanical engineering
  305. graduate student at Old Dominion University, Norfolk, is studying how advanced
  306. propulsion systems can be applied to civil transportation.
  307.  
  308.         "Reaching for the Stars" is co-produced by the Virginia Space Grant
  309. Consortium (VSGC), NASA and Old Dominion University. Substantial support for
  310. this series was provided through NASA Headquarters' Minority University
  311. Research Program and the Education Division.
  312.  
  313.         The Virginia Space Grant Consortium is part of a nationwide network of
  314. NASA's National Space Grant College and Fellowship Program. The VSGC and its 14
  315. partners in Virginia develop programs that promote teacher training and
  316. curriculum enhancement and encourage adequate math and science preparation
  317. among students for America's future high-tech workforce needs.
  318.  
  319.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  320. =--=--=-END-=--=--=
  321.  
  322. =--=--=START=--=--= NASA Spacelink File Name:921211B.REL
  323.  
  324.  NOTE: This file is too large {15676 bytes} for inclusion in this collection.
  325.     The first line of the file:
  326.  
  327. 12/11/92: KSC CLOSES OUT 1992 WITH 8 SPACE SHUTTLE AND 5 EXPENDABLE VEHICLE
  328.  
  329.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  330. =--=--=-END-=--=--=
  331.  
  332. =--=--=START=--=--= NASA Spacelink File Name:6_6_9_4_12.TXT
  333.  
  334. UARS Monthly Status Report  11/30/92
  335.  
  336. UPPER ATMOSPHERE RESEARCH SATELLITE
  337.  
  338.  
  339.       The observatory is performing nominally with all instruments performing
  340. scheduled operations except the Improved Stratospheric and Mesospheric Sounder
  341. (ISAMS).  The power system continues to be stable and is performing well.
  342. Differential voltages have been stable for all three batteries.  Attempts to
  343. restart ISAMS have continued and were rewarded November 13, by a significant
  344. sudden change in the thermal behavior of the chopper system.  The cause of this
  345. change is not clear, but the restart attempts are continuing more
  346. optimistically and the telemetry is being closely monitored for any signs of
  347. chopper rotation.
  348.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  349. =--=--=-END-=--=--=
  350.  
  351. =--=--=START=--=--= NASA Spacelink File Name:6_7_2_10_11.TXT
  352.  
  353. HST Monthly Status Report 11/30/92
  354.  
  355. HUBBLE SPACE TELESCOPE
  356.  
  357.  
  358.       Controllers are still investigating an anomaly involving a gyro, which
  359. occurred November 18.  The spacecraft continues to operate and perform routine
  360. science operations.  Initial telemetry indicated that the gyro lost
  361. synchronization and motor current.  A later review of all monitors points to an
  362. interruption of power to Gyro 1.  It has been commanded off for further study.
  363. Candidate causes of the gyro anomaly include other anomalies within the control
  364. electronics unit (such as a failed fuse).  An assessment of safely restarting
  365. Gyro 1 is in progress.  Other actions being evaluated include 1) changes to HST
  366. safemode configuration memory to remove access to Gyro 1, and 2) test and
  367. activation of backup safemode software which increases vehicle protection when
  368. in a three-gyro configuration.  Gyros 2,3, and 5 are operating normally.
  369. Safemode will protect HST in the near term should another gyro failure or other
  370. anomaly occur.  These gyros are part of HST's pointing control subsystem, which
  371. maintains the spacecraft's positional stability and aligns the spacecraft to
  372. point to an remain locked on any specific target.
  373.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  374. =--=--=-END-=--=--=
  375.  
  376. =--=--=START=--=--= NASA Spacelink File Name:6_7_5_5_10.TXT
  377.  
  378. COMPTON Monthly Status Report 11/30/92
  379.  
  380. COMPTON GAMMA RAY OBSERVATORY
  381.  
  382.  
  383.        Battery performance continues to be monitored very closely, with power
  384. configurations adjusted as necessary.  The observatory is functioning normally
  385. with primary systems powered from modular power subsystem 2, which is
  386. performing very well.  Modular power subsystem 1 continues to support a reduced
  387. load of mainly heaters.  A Tracking and Data Relay Satellite (TDRS) ground
  388. station is under development at Tidbinbilla, Australia, as part of an effort to
  389. increase real-time data collection from Compton via three TDRSs. All science
  390. instruments are performing nominally.
  391.  
  392.  
  393.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  394. =--=--=-END-=--=--=
  395.  
  396. =--=--=START=--=--= NASA Spacelink File Name:6_7_7_7_4.TXT
  397.  
  398. EUVE Monthly Status Report 11/30/92
  399.  
  400. EXTREME ULTRAVIOLET EXPLORER   
  401.  
  402.  
  403.      The first official list of bright EUVE sources was released internally to
  404. the EUVE project at the University of California, Berkeley. This list was
  405. compiled from 163 sources detected, and the data from each detected source was
  406. examined visually to screen out spurious or possibly spurious sources.  The
  407. screening resulted in a final list of 49 definite sources and an additional 59
  408. sources which are being analyzed further.  The 49 definite sources have been
  409. compiled into the first EUVE bright source list.  Classes of sources in this
  410. first list include hot white dwarfs, planetary nebula, flare stars and cool
  411. star coronae.  Of the list of 49, 20 sources had no immediate optical
  412. counterparts and have been handed over to the optical identification subgroup.
  413.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  414. =--=--=-END-=--=--=
  415.  
  416. =--=--=START=--=--= NASA Spacelink File Name:6_8_3_4_38.TXT
  417.  
  418. MGN STATUS 12/4 
  419.  
  420. Magellan Status
  421.  
  422. Status Report of Magellan for Friday, December 4, 1992:
  423.  
  424. 1.  Magellan continues to operate normally, transmitting a carrier
  425. plus 40 bps X-band signal which is precisely tracked by the DSN
  426. stations to provide gravity data.
  427.  
  428. 2.  Yesterday the G2339 command sequence was successfully uplinked to
  429. the  spacecraft and will begin execution this morning on orbit #6352.
  430. This sequence is similar to the previous two-week control sequences,
  431. but contains a radio science experiment to be performed on Sunday
  432. night.
  433.  
  434. 3.  Spacecraft temperatures remain in the expected range.  Bay 7,
  435. which contains the CDS, is at 51 deg. C. with a cycle depth of 6
  436. degrees.  Transmitter B is at 52.7 deg. C. which is below the temp
  437. where satisfactory performance at 1200 bps is found.
  438.  
  439. 4.  The spacecraft has completed 6240 orbits of Venus; 604 so far in
  440. Cycle 4, which will end on May 25, 1993.  Cycle 4 is now one-third
  441. complete.
  442.  
  443. 5.  Doug Griffith, Project Manager, traveled to Nagoya, Japan, where
  444. he presented a paper at the 1993 International Space Symposium.  He
  445. will return to Southern California today, and will be back in the
  446. office on Monday, Dec. 7th.
  447.  
  448. 6.  The project received a letter from NASA Headquarters assuring
  449. $3.0M for funding of additional processing and archiving of Magellan
  450. science data.  In addition to FY93 investigator contracts, the funding
  451. covers radar processing to correct dynamic range and geometric
  452. distortions in Cycle 2 F-BIDRs, the production of 30 additional
  453. compact disks containing mosaicked images, the development of a Rtool
  454. kitS for analysis of stereo images, and the completion of data product
  455. deliveries to PDS and NSSDC.
  456.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  457. =--=--=-END-=--=--=
  458.  
  459. =--=--=START=--=--= NASA Spacelink File Name:6_8_3_4_39.TXT
  460.  
  461. MGN STATUS 12/7 
  462.  
  463. Magellan Status
  464.  
  465. Status Report of Magellan for Monday, December 7, 1992:
  466.  
  467. 1.      Magellan continues to operate normally, transmitting a carrier plus
  468. 40 bps X-band signal which is precisely tracked by the DSN stations to
  469. provide gravity data.
  470.  
  471. 2.      Late last night, the spacecraft performed a radio science
  472. experiment on orbits #6369 and 6370.  For 22 minutes, as the
  473. spacecraft passed behind Venus (as viewed from Earth), Magellan
  474. performed a limb-tracking maneuver.  In this way, the received signal
  475. was passing deeper and deeper through the atmosphere of Venus as it
  476. was refracted around the limb.
  477.  
  478. 3.      By measuring the attenuation and doppler shift of both the S and
  479. X-band carrier signals, scientists can study to relative abundances of
  480. H2SO4 (sulfuric acid) and CO2 (carbon dioxide), as well as other
  481. measures of the atmosphere.
  482.  
  483. 4.      Spacecraft temperatures remain in the expected range.  Bay 7, which
  484. contains the CDS, is at 51 deg. C. with a cycle depth of 65 degrees.
  485. During the radio science experiment the temperature increased
  486. somewhat, but stayed below the operational limit of 55 deg. C.  The
  487. transmitter B peaked at 52 deg. C.
  488.  
  489. 5.      The spacecraft has completed 6263 orbits of Venus; 627 so far in
  490. Cycle 4, which will end on May 25, 1993.
  491.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  492. =--=--=-END-=--=--=
  493.  
  494. =--=--=START=--=--= NASA Spacelink File Name:6_8_4_9_23.TXT
  495.  
  496. MARS OBSERVER STATUS REPORT
  497. November 30, 1992
  498. 12:30 AM PST
  499. Launch +66 Days
  500.  
  501. Flight sequence C4 is active through December 14.  The Mars Observer Camera
  502. bakeout continues through December 28.  The Gamma Ray Spectrometer and
  503. Magnetometer instruments are powered on, but are in a quiescent state.  No
  504. spacecraft or instrument commanding is planned for today.
  505.  
  506. Magnetometer/Electron Reflectometer Geotail experiment command files are in the
  507. development, approval and generation process in anticipation of planned uplink
  508. and execution on December 9 through 13.
  509.  
  510. A Star Catalog/Ephemeris uplink is planned for Wednesday, December 2.  The new
  511. ephemeris will affect spacecraft attitude to provide optimal low gain antenna
  512. Earth pointing while keeping the solar array at the desired sun incidence
  513. angle.
  514.  
  515. The Spacecraft and Instrument Teams report that all Mars Observer subsystems
  516. and instruments continue to perform well.
  517.  
  518. Today the spacecraft is 20,145,674 km (12,517,941 miles) from Earth, traveling
  519. at a velocity of 5.1265 kilometers per second (11,467 miles per hour) with
  520. respect to Earth. One way light time is approximately 67 seconds.
  521.  
  522.  
  523.  
  524.  
  525. MARS OBSERVER STATUS REPORT
  526. December 2, 1992
  527. 11:00 AM PST
  528. Launch +68 Days
  529.  
  530. Flight sequence C4 remains active through December 14.  The Mars Observer
  531. Camera bakeout is continuing through December 28.  The Gamma Ray Spectrometer
  532. and Magnetometer instruments are powered on, but are in a quiescent state.
  533.  
  534. Verification of successful commanding has been received for the Star
  535. Catalog/Ephemeris uplink and activation which took place this morning.  The new
  536. ephemeris will affect spacecraft attitude to provide optimal low gain antenna
  537. Earth pointing while keeping the solar array at a desired sun incidence angle.
  538.  
  539. Magnetometer and Electron Reflectometer Geotail experiment command files are in
  540. the development, approval and generation process in anticipation of planned
  541. uplink and execution on December 8 through 14.  The Geotail experiment will
  542. take place in the period December 8 through 12.  Commanding will be performed
  543. to configure the spacecraft as required for the experiment and to reconfigure
  544. back to normal cruise configuration upon completion of Geotail measurement
  545. activities.
  546.  
  547. The Spacecraft and Instrument Teams report that all Mars Observer subsystems
  548. and instruments continue to perform well.
  549.  
  550. Today the spacecraft is 21,010,679 km (13,055,430 miles) from Earth, traveling
  551. at a velocity of 5.3618 kilometers per second (11,994 miles per hour) with
  552. respect to Earth. One way light time is approximately 70 seconds.
  553.  
  554.  
  555.  
  556.  
  557. MARS OBSERVER STATUS REPORT
  558. December 4, 1992
  559. 10:00 AM PST
  560. Launch +70 Days
  561.  
  562. Flight sequence C4 remains active through December 14.  The Mars Observer
  563. Camera bakeout is continuing through December 28.  The Gamma Ray Spectrometer
  564. and Magnetometer instruments are powered on, but are in a quiescent state.  The
  565. spacecraft is transmitting in the Mission Mode at a data rate of 250 bits per
  566. second.  It will remain at this rate/mode until High Gain Antenna activation,
  567. currently planned for January 4, 1993.
  568.  
  569. Today marks ten weeks since launch.  The Mars Observer Spacecraft and
  570. Instrument Teams report that all spacecraft subsystems and instruments are
  571. performing nominally.
  572.  
  573. In-flight activities this week were minimal.  The primary activity was uplink
  574. and activation on Tuesday of a new Star Catalog/Ephemeris which affected
  575. spacecraft attitude to provide optimal low gain antenna Earth pointing while
  576. keeping the solar array at a desired sun incidence angle to protect against
  577. excessive electrical power build-up.
  578.  
  579. Command files for the recently proposed Magnetometer and Electron Reflectometer
  580. Geotail experiment are in the development, approval, and generation process in
  581. anticipation of the 8 - 12 December Geotail measurement opportunity.
  582.  
  583. A "Power-In" maneuver Preliminary Design Review will be held Friday, 11
  584. December.
  585.  
  586. As of today, the spacecraft is 21,918,495 km (13,619,521 miles) from Earth,
  587. traveling at a velocity of 5.6069 kilometers per second (12,542 miles per hour)
  588. with respect to Earth. One way light time is approximately 73 seconds.
  589.  
  590.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  591. =--=--=-END-=--=--=
  592.  
  593. =--=--=START=--=--= NASA Spacelink File Name:6_8_4_9_24.TXT
  594.  
  595. MARS OBSERVER STATUS REPORT
  596. December 7, 1992
  597. 1:00 PM PST
  598. Launch +73 Days
  599.  
  600. Flight sequence C4 remains active through December 14.  The Mars Observer
  601. Camera bakeout is continuing through December 28.
  602.  
  603. Command files for the recently proposed Magnetometer and Electron Reflectometer
  604. Geotail experiment have been prepared.  They will be uplinked and executed in
  605. three loads on the 9th, 11th and 14th of December. The Gamma Ray Spectrometer
  606. team will also be receiving data during Geotail measurement activities.
  607.  
  608. A "Power-In" maneuver Preliminary Design Review will be held Friday, 11
  609. December.
  610.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  611. =--=--=-END-=--=--=
  612.  
  613. =--=--=START=--=--= NASA Spacelink File Name:6_8_5_3_39.TXT
  614.  
  615. ULYSSES MISSION OPERATIONS REPORT 
  616.  
  617. PERIOD:   24th November to 30th November 1992
  618.  
  619. 1.   MISSION OPERATIONS
  620.  
  621.      Experiment  reconfigurations  have  been  carried   out   as
  622.      required.
  623.  
  624.      On  25th  November KEP GAS (Neutral Gas experiment) data
  625.      were switched off following completion of the scanning activity.
  626.  
  627.      On  27th  November a KEP RAM dump was carried out.   It  had
  628.      been originally foreseen to be carried out on 26th  November
  629.      but was delayed due to operational constraints.
  630.  
  631.      On  30th  November  a  KEP  EPAC (Energetic Particles experiment)
  632.      in flight  calibration  was carried out.
  633.  
  634.  
  635.      A  routine  Earth pointing manoeuvre was performed  on  26th
  636.      November.
  637.  
  638.      An  average of 96.88 % data recovery was achieved during the
  639.      reporting period.
  640.  
  641.      The percentage of data acquired as a function of bit rate is
  642.      as follows:
  643.  
  644.      1024 bps 36.25 %
  645.       512 bps 60.61 %
  646.  
  647.      On 27th November an earthquake occurred in the neighborhood
  648.      of  the  Goldstone  complex which affected data  acquisition
  649.      operations.  43 minutes of realtime data and 87  minutes  of
  650.      playback data were lost as a result of the 34 meter  antenna
  651.      being stowed following the earthquake.
  652.  
  653.      A reduction in the number of ranging passes continued during
  654.      the reporting period in order to improve the poor signal  to
  655.      noise  ratio  encountered at the present  large  spacecraft-
  656.      Earth distances.
  657.  
  658. 2.   SPACECRAFT STATUS
  659.  
  660.      POWER
  661.  
  662.      Nominal.
  663.      Estimated S/C power consumption 258 watts.
  664.  
  665.      AOCS
  666.  
  667.      Nominal.
  668.  
  669.      TTC
  670.  
  671.      The spacecraft is currently configured with receiver 2 as the
  672.      prime unit fed via the high gain antenna and with receiver 1
  673.      as  backup  fed  through the low gain antenna  (LGA-F).  The
  674.      downlink is provided through EPC2/TWTA2.
  675.  
  676.      The  34  meter  ground stations are in use  to  support  TTC
  677.      operations, with at least one 70m station pass per  week  to
  678.      support ranging.
  679.  
  680.      Received downlink level -142 dBm.(34 meter) X-band.
  681.  
  682.      (Variations of up to 10 db. can be expected as a  result  of
  683.      station  antenna  in  use,  local  weather  conditions,  and
  684.      spacecraft antenna off-pointing).
  685.  
  686.      Received uplink level -123 dBm.
  687.  
  688.      DATA HANDLING
  689.  
  690.      The  anomaly on CTU2 reported in previous Operations Reports
  691.      is  still  under investigation.  The operational  impact  of
  692.      this anomaly is being studied by both the Spacecraft Control
  693.      Team  and  the instrument teams in the event that  this  CTU
  694.      would have to be configured for operational use.
  695.  
  696.      THERMAL
  697.  
  698.      Nominal.
  699.  
  700. 3.   FLIGHT DYNAMICS
  701.  
  702.      Solar Aspect   The angle increased from 10.45 on
  703.      Angle (deg.)   24th November to 10.70 on 30th November.
  704.  
  705.      Sun-Probe-Earth  The angle increased from 10.46 on
  706.      Angle (deg.)     24th November to 10.78 on 30th November.
  707.  
  708.      Spin Rate               4.981 rpm.
  709.  
  710. 4.   ORBITAL DATA
  711.  
  712.      Data taken at 13:00 PDT on 30th November.
  713.      Distance from Earth                786,793,487 km.
  714.      Velocity relative to the Earth         130,245 km/hr.
  715.      Velocity relative to the Sun            32,914 km/hr.
  716.      Ecliptic latitude                         14.0 deg/south
  717.  
  718. 5.   PLANNED OPERATIONS
  719.  
  720.      Routine  data  gathering operations will  continue  together
  721.      with experiment reconfigurations as required.
  722.  
  723.      On 2nd December a HED (Magnetic Field instrument) calibration
  724.      will be carried out.
  725.  
  726.      Earth  pointing manoeuvres will be performed on 1st and  4th
  727.      December.
  728.  
  729.      Periods  of  2048  bps  at low antenna  elevations  will  be
  730.      avoided  to improve the signal to noise ratio in the  coming
  731.      months.   This will slightly reduce the percentage  of  1024
  732.      bps real-time data received.  During this period, 70m passes
  733.      will   also  be  scheduled  to  perform  ranging  at   large
  734.      spacecraft-Earth distances while maintaining the desired bit
  735.      rates.
  736.  
  737. 6.   GROUND SEGMENT
  738.  
  739.      The  ground segment performed nominally during the reporting
  740.      period.
  741.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  742. =--=--=-END-=--=--=
  743.  
  744. =--=--=START=--=--= NASA Spacelink File Name:7_2_8_16.TXT
  745.  
  746.  NOTE: This file is too large {15676 bytes} for inclusion in this collection.
  747.     The first line of the file:
  748.  
  749. 12/11/92: KSC CLOSES OUT 1992 WITH 8 SPACE SHUTTLE AND 5 EXPENDABLE VEHICLE
  750.  
  751.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  752. =--=--=-END-=--=--=
  753.  
  754. =--=END OF COLLECTION---COLLECTED 15 FILES---COMPLETED 21:03:48=--=
  755.  
  756. ====PRESS RETURN TO CONTINUE====
  757.  
  758.  
  759. Enter an option number, 'G' for GO TO, ? for HELP, or
  760.   press RETURN to redisplay menu...